Capabilities
What we build, and what we verify before it ships.
The specifications engineers read before deciding whether to trust a new vendor. If your assembly sits outside these, send the drawing anyway — most exceptions are workable.
Assemblies
- Harness types
- Discrete wire harnesses, cable assemblies, ribbon, coax, overbraided bundles
- Quantities
- 1 piece to short-run production
- Breakouts
- Multi-branch harnesses with labelled breakouts
Wire and conductors
- Gauge range
- 28 AWG – 10 AWG
- Insulation
- PVC, PTFE, ETFE, silicone, cross-linked
- Shielding
- Foil, braid, drain-wire terminations
Terminations
- Crimping
- Open- and closed-barrel, applicator-tooled with pull-force verification
- Connector families
- JST, Molex, TE, Deutsch, Amphenol, circular MIL-style
- Splices
- Crimp splices, soldered and sealed splices
Protection and marking
- Coverings
- Heat shrink, braided sleeving, convoluted tubing, harness tape
- Marking
- Printed wire labels, heat-shrink markers, connector ID
- Strain relief
- Backshells, grommets, cable ties and mounts
Quality and test
- Workmanship
- Built to IPC/WHMA-A-620 Class 2 by default; Class 3 on request
- Electrical test
- 100% continuity test on every assembly
- Documentation
- Test records and build documentation supplied with every order
Turnaround
Lead times we commit to.
| Tier | Quantity | Lead time | Notes |
|---|---|---|---|
| Standard | 1–25 | 15 business days | The default for most prototype builds. |
| 26–100 | 25 business days | ||
| 101–250 | 35 business days | ||
| Expedite | 1–10 | 10 business days | Priority scheduling on the bench. |
| 11–50 | 15 business days | ||
| 51–150 | 25 business days | ||
| Rush | 1–10 | 5 business days | Subject to connector and wire availability. |
| 11–25 | 8 business days |
Turnaround depends on how many you need — a run of ten and a run of a hundred are different jobs. Lead time is counted from quote approval, not from when the drawing arrives, and rush builds depend on connector and wire availability, which we confirm before committing to a date. Above 250 units we quote the schedule individually rather than working from this table.